Performance Through Engineering
Your Portal Upgrade Journey
A clear, engineering-led process—from first call to build-ready plan—so your portal axle upgrade is specified correctly for your vehicle, load, and terrain.

Step 1: Initial Consultation
Portal kits are manufactured to suit your vehicle model. Once your order is confirmed, allow 4–6 weeks for production and delivery to your installer.

Vehicle + use-case intake
We capture your platform, current setup, tyre size targets, load, and the terrain you actually drive.
Engineering fitment check
We confirm compatibility, expected clearance gains, gearing considerations, and any supporting components required.
Installer pathway
We align the plan with an Australian workshop partner for correct fitment, setup, and ongoing support.
Build Planning
Step 2: Order & Build Specification
We translate your goals into a build-ready specification—clear, documented, and aligned with workshop realities.
Configuration blueprint
A structured summary of portal system selection, intended tyre size, load profile, and performance targets.
Parts + supporting components
We identify required supporting items (as applicable) to maintain driveline angles, braking performance, and reliability.
Workshop-ready scope
A clear scope for your installer: what’s included, what’s optional, and what needs verification during fitment.
Timeline + next steps
Practical sequencing for ordering, scheduling, and handover—so the build moves forward without guesswork.
Build Planning
Step 3: Pre-Installation Vehicle Assessment
Before your kit goes to the installer, we assess your vehicle to confirm fitment is correct for your specific build.
What we check
Confirm vehicle model, variant, and production year against the ordered kit Review current suspension setup, wheel offset, and tyre size against portal requirements,
Parts + supporting components
We identify required supporting items (drag link, tie rod, suspension upgrades as applicable) to maintain driveline angles, braking performance, and reliability.
Workshop-ready scope
A clear scope for your installer: what’s included, what’s optional, and what needs verification during fitment.
Why this matters
Portal axles are model-specific and built to order with a 4–6 week lead time. This assessment step ensures your kit arrives ready to install — with no surprises on the day.
Ready to spec it properly?
Start with an engineering-led consultation
Tell us your vehicle, tyre goals, and where you drive. We’ll map the right portal pathway and connect you with the right Australian workshop partner.